Posts Tagged ‘Height-Adjustable Lab Table’

Longo Completes Construction of Chemistry Laboratory at Albertus Magnus High School

Wednesday, September 8th, 2010

Project:  Chemistry Lab at Albertus Magnus High School

Location: Bardonia, NY (Rockland County)

Scope:  Complete Turnkey Project. 

Contact:  Nat Longo (nlongo@longoinc.com)

Nat Longo speaks about Longo’s recent chemistry laboratory construction project at Albertus Magnus High School.  Longo provided complete turnkey services (architectural design & general construction) for this private high school in Rockland County, NY.

Check out the video below:

Are you a private school official and are considering a science lab renovation?  Looking for laboratory planning assistance?  Need new science lab furniture? Longo can help!

Please direct all inquiries with regards to laboratory planning, furniture and construction projects to the marketing department at Longo (info@longoinc.com).  To request a consultant & laboratory space evaluation, email Anthony Stellatos (anthonys@longoinc.com). 

Longo offers laboratory planning, budget and full turnkey services to industrial/commercial clients and private schools in New Jersey (Bergen-Passaic-Essex-Hudson-Morris Counties), New York (Westchester-Rockland-Dutchess-Putnam-Orange Counties) and Connecticut (Fairfield County). Please contact us for your laboratory planning and furniture requirements (info@longoinc.com).

Sheldon’s Axis Science Lab Station In Motion…

Wednesday, July 7th, 2010

 

Here is a quick video of Sheldon Laboratory System’s newest Laboratory Workstation: The Axis 26000

This lab table’s unique ability to combine laboratory and lecture areas – creating dynamic learning environments where once space constraints limited the facility’s ability to be renovated.

Does your child’s private school’s laboratories need an upgrade?  Do you think they should be taught science in a 21st century designed laboratory with educationally-correct science lab furniture?  If you answered “YES” to both of those questions, please forward this web post over to your private school administrator.  Or email us and we will reach out to them – Longo’s consultants are able to provide free laboratory evaluations and meet with school administrators to determine the safest course of action while maintaining fiscal responsibility.

Longo offers laboratory planning, budget and full turnkey services to industrial/commercial clients and private schools in New Jersey (Bergen-Passaic-Essex-Hudson-Morris Counties), New York (Westchester-Rockland-Dutchess-Putnam-Orange Counties) and Connecticut (Fairfield County). Please contact us for your laboratory design and furniture requirements 800-635-6646, (info@longoinc.com).

Iona Prep Selects Longo For Laboratory Construction Project

Monday, June 14th, 2010

Location:  New Rochelle, NY (Westchester County)

Scope:  Full Turnkey Construction Service – Physics Room Renovation & Create New Physics Laboratory Space

Products Specified & Delivered:  Sheldon Wood Laboratory Casework, Fume Hoods, Axis 3 Physics Tables, Epoxy Resin Tops

Iona Prep selected Longo because of our committment to delivering a high quality laboratory environment on-time and within budget.  Longo had previously completed the biology & chemistry labs at the school in 2007.

To learn more about the programs offered at Iona Preparatory School, please visit http://www.ionaprep.org/

Please direct all inquiries with regards to the Iona Prep School construction project to the marketing department at Longo (info@longoinc.com). Longo offers full turnkey services to all private schools in the Westchester-Rockland-Dutchess-Putnam-Orange area, along with Fairfield County in Connecticut.

Longo Installs Science Labs In Upper Saddle River, NJ

Tuesday, March 30th, 2010

Project:  Cavalini Middle School, Upper Saddle River, NJ (Bergen County)

Products Specified & Delivered:  Sheldon Wood Laboratory Casework, Fume Hoods, Axis Infinity Laboratory Stations, TEII Lab Centers

Purchasing By General Contractor – public/competitively bid project.

School district had asked Longo to assist in the design of middle school science labs in early 2009 for that summer delivery – and WE DELIVERED!

Longo’s laboratory consulting team works with school district officials, architects and construction managers to professionally design lab space for optimum saftey and functionality.  Please direct all inquiries with regards to the laboratory planning, furniture and construction projects to the marketing department at Longo (info@longoinc.com)

Sheldon Product Update: New Axis Infinity to Replace Axis3 Student Lab Stations

Friday, March 26th, 2010

Importance of post: All 2010 Longo science lab projects utilizing Sheldon’s Axis Student Lab Stations will be converted to the new Axis Infinity Model – this change will not result in additional costs, increased lead times or any other issues that might have occurred if not for the swift project manangment by the combined efforts of Longo and Sheldon’s design & engineering team.

A Look Back On Why The Axis3 was so important…

Sheldon’s groundbreaking Axis 3® design combined separate lab and lecture areas into a single, dynamic learning center, making maximum use of space and streamlining the laboratory/classroom experience.

The patented Axis 3 was the first lab station designed to accommodate the latest in computer technology. The table was available in a variety of models that allow for the integration of standard desktop computers, flat-screen monitors or individual laptops.

The tabletop’s unique shape allowed four students to work in pairs facing the instructor or individually around the perimeter of the table, with access to the sink and services. The tabletop quickly and smoothly adjusts from a sitting to a standing height. Contoured edges eliminated the sharp corners found on traditional lab tables, allowing students and teachers easy movement around the table.